Make sure the parent change is set for changes with intermediate parent
1. When root Task is resized and collected, there can be another WCT from TaskFragmentOrganizer later to change the TF in the same transition. We want to make sure that the parent change field is populated even if the intermediate parent (leaf task) has no change (because the snapshot was taken early enough). 2. Ensure the AE window changes that are dependent of Task change is updated in start transaction Bug: 328014766 Test: verify with system split using Settings. Change-Id: I9dc5c0b866f6ec8dec8878269eb25f90b6100742
Loading
Please register or sign in to comment