Donate to e Foundation | Murena handsets with /e/OS | Own a part of Murena! Learn more

Skip to content
Commit 6103255c authored by Chris Li's avatar Chris Li
Browse files

Make sure the parent change is set for changes with intermediate parent

1. When root Task is resized and collected, there can be another WCT
   from TaskFragmentOrganizer later to change the TF in the same
   transition. We want to make sure that the parent change field is
   populated even if the intermediate parent (leaf task) has no change
   (because the snapshot was taken early enough).

2. Ensure the AE window changes that are dependent of Task change is
   updated in start transaction

Bug: 328014766
Test: verify with system split using Settings.
Change-Id: I9dc5c0b866f6ec8dec8878269eb25f90b6100742
parent 42ca889a
Loading
Loading
Loading
Loading
0% Loading or .
You are about to add 0 people to the discussion. Proceed with caution.
Finish editing this message first!
Please register or to comment