Separate the tasks on the main sync and test worker thread
We'll need two threads here since enableWindowMagnificationWithOffset_expectedValues will require some time for updating the layout on the screen. postDelayed does not help here since the test will end directly instead of waiting for the delayed task to complete. Therefore, we would like to return to previous `runOnMainSync` way to only put the required tasks on the main thread and wait on the test worker thread to verify the result. Bug: 303132156 Bug: 305732249 Flag: NA Test: atest SystemUITests:WindowMagnificationAnimationControllerTest Change-Id: I661a1a6722e9686cdae62a0c8dcb080c46d7e868
Loading
Please register or sign in to comment