Attempt to fix NPE when reparent to the original task.
7f64b144, Fix back stack for PiP from multi-activity Task. Trying to reparent pinned activity back to its original task. The NPE is introduced when the original task is removed. This CL removes the pinned task when the original task is to be removed and checks for the task is attached before doing the re-parent. Bug: 186374793 Test: atest PinnedStackTests Test: atest RootWindowContainerTests Change-Id: I6ea6100cb94b3982737c89f68de824a14415283a
Loading
Please register or sign in to comment