NuPlayer: Teardown sequence for pcm offload
On a teardown event, follow proper shutdown sequence if the decoder instance type is not passthrough. This is needed to ensure NuPlayerDecoder, MediaCodec do not enter an invalid state due to forced clear while handling a teardown event. CRs-Fixed: 916643 Change-Id: Ied5df07dc8567974ef02e3a0bb415795f31f2ed2
Loading
Please register or sign in to comment