msm: mdss: fix pp setup on SSPP pipe in rotation scenario
mfd is not updated on controller when pipe is setup
for rotation scenario. However, post processing module
check it for all use cases that leads to pp update
failure SSPP pipe. This change avoids the extra checking
and allows pp module to update SSPP pipe in all use
case scenarios.
Change-Id: I8718e67ca49067c9af7b492da7cdb1344e826389
Signed-off-by:
Dhaval Patel <pdhaval@codeaurora.org>
Loading
Please register or sign in to comment