Donate to e Foundation | Murena handsets with /e/OS | Own a part of Murena! Learn more

Skip to content
Commit 5b0311e1 authored by Frederic Weisbecker's avatar Frederic Weisbecker
Browse files

perf: Allow pinned and flexible groups to be scheduled separately



Tune the scheduling helpers so that we can choose to schedule either
pinned and/or flexible groups from a context.

And while at it, refactor a bit the naming of these helpers to make
these more consistent and flexible.

There is no (intended) change in scheduling behaviour in this
patch.

Signed-off-by: default avatarFrederic Weisbecker <fweisbec@gmail.com>
Cc: Peter Zijlstra <peterz@infradead.org>
Cc: Paul Mackerras <paulus@samba.org>
Cc: Ingo Molnar <mingo@elte.hu>
Cc: Arnaldo Carvalho de Melo <acme@infradead.org>
parent 42cce92f
Loading
Loading
Loading
Loading
0% Loading or .
You are about to add 0 people to the discussion. Proceed with caution.
Please register or to comment