sched: bring in missing change in boost, fix minor issues in tune & walt
While bringing in boost changes as part of commit bb5b6b3e ("sched: Add snapshot of Window Assisted Load Tracking (WALT)"), looks like kick_mask in boost_kick_cpus function wasn't picked properly. Update the same to be in sync with msm-4.9. Also, fix indetation issues in tune and remove unused cpu variable in walt. Change-Id: If20120bddd51236de08f0714a956aa3b5534201b Signed-off-by:Satya Durga Srinivasu Prabhala <satyap@codeaurora.org>
Loading
Please register or sign in to comment