USB: dwc3-msm: Initialize DBM ep before BAM pipe reset
On new platforms, endpoint clock gating is added for dbm endpoints with Synopsys USB3.0 controller. This hardware feature requires initialization of DBM endpoint before BAM pipe reset for bam2bam mode data transfers working. Hence change sequence such that do DBM endpoint initialization first followed by BAM pipe reset and do start transfer as last operation. CRs-Fixed: 965207 Change-Id: Ib5bfd1a7d258fe336a4c9924850fc9223c1c81f6 Signed-off-by:Vijayavardhan Vennapusa <vvreddy@codeaurora.org> Signed-off-by:
Chandana Kishori Chiluveru <cchiluve@codeaurora.org>
Loading
Please register or sign in to comment