Donate to e Foundation | Murena handsets with /e/OS | Own a part of Murena! Learn more

Skip to content
Commit 7e6d5809 authored by Umang Agrawal's avatar Umang Agrawal Committed by Guru Das Srinagesh
Browse files

power: smb5: Implement charge termination WA



Currently post charge termination, if the charger switches to BSM
mode, then there exist a possibility of battery being overcharged.
This is due to finite delay in opening of BATFET post its requirement
to stay in BSM mode, allowing charge current to leak into the battery,
resulting in over charge.

Add a SW WA to suspend input, once cc_soc increases beyond a certain
threshold post termination.

Change-Id: I6c1966bb69445c89bc29b099ab9adf2d5f3e2334
Signed-off-by: default avatarUmang Agrawal <uagrawal@codeaurora.org>
parent 24ecafa1
Loading
Loading
Loading
Loading
0% Loading or .
You are about to add 0 people to the discussion. Proceed with caution.
Please register or to comment