ANDROID: FIX: sched/tune: update usage of boosted task utilisation on CPU selection
A boosted task needs to be scheduled on a CPU which can grant a minimum capacity which is higher than its utilization. However, a task can be allocated on a CPU which already provides an utilization which is higher than the task boosted utilization itself. Moreover, with the previous approach a task 100% boosted is not fitting any CPU. This patch makes use of the boosted task utilization just as a threashold which defines the minimum capacity should be available on a CPU to host that task. Signed-off-by:Patrick Bellasi <patrick.bellasi@arm.com> Signed-off-by:
Andres Oportus <andresoportus@google.com>
Loading
Please register or sign in to comment