Donate to e Foundation | Murena handsets with /e/OS | Own a part of Murena! Learn more

Skip to content
Commit 37092142 authored by Umang Agrawal's avatar Umang Agrawal
Browse files

power: smb5: Implement charge termination WA



Currently post charge termination, if the charger switches to BSM mode,
then there exist a possibility of battery being overcharged. This is
due to finite delay in opening of BATFET post its requirement to stay
in BSM mode, allowing charge current to leak into the battery, resulting
in over charge.

Add a SW WA to suspend input, once cc_soc increases beyond a certain
threshold post termination.

Change-Id: I6c1966bb69445c89bc29b099ab9adf2d5f3e2334
Signed-off-by: default avatarUmang Agrawal <uagrawal@codeaurora.org>
parent 2abf96e5
Loading
Loading
Loading
Loading
0% Loading or .
You are about to add 0 people to the discussion. Proceed with caution.
Finish editing this message first!
Please register or to comment