Donate to e Foundation | Murena handsets with /e/OS | Own a part of Murena! Learn more

Skip to content
Commit 8173dd2c authored by Henri Chataing's avatar Henri Chataing
Browse files

RootCanal: Bypass LL CONNECTION PARAMETER REQ in central role

When in Central Role in a LE connection, connection parameters
can be pushed directly to the connected Peripheral without
negotiation using LL CONNECTION PARAMETER IND.

This specific use case is necessary to pass the PTS test
GAP/CONN/CPUP/BV-06-C because the PTS does not implement
support for the LE Remote Connection Parameter Request
event

Test: PTS test GAP/CONN/CPUP/BV-06-C
Change-Id: I7a532b6e2c5cb3590a3c34a9ad708747c0fd2ae9
parent 18444503
Loading
Loading
Loading
Loading
0% Loading or .
You are about to add 0 people to the discussion. Proceed with caution.
Please register or to comment