+5
−5
Loading
Donate to e Foundation | Murena handsets with /e/OS | Own a part of Murena! Learn more
Before this change, when the background dexopt job finishes, it passes true to jobFinished, which indicates that the job failed and should be rescheduled. This CL fixes the bug by always passing false instead. This is correct because: - If the job finishes normally, it should not be rescheduled. - If the job is cancelled by the job scheduler, the job scheduler will ignore the jobFinished call. Instead, it will look at the return value of onStopJob, which is true. Bug: 255943027 Test: Presubmit Change-Id: Ifaabe452aa5fbde9319f84aa8d4e99d7d3350154