+31
−2
+8
−0
+2
−0
Loading
Donate to e Foundation | Murena handsets with /e/OS | Own a part of Murena! Learn more
Instead of monitoring the exec time of deadline tasks to evaluate the CPU capacity consumed by deadline scheduler class, we can directly calculate it thanks to the sum of utilization of deadline tasks on the CPU. We can remove deadline tasks from rt_avg metric and directly use the average bandwidth of deadline scheduler in scale_rt_capacity. Based in part on a similar patch from Luca Abeni <luca.abeni@unitn.it>. Signed-off-by:Vincent Guittot <vincent.guittot@linaro.org> Signed-off-by:
Steve Muckle <smuckle@linaro.org>