+12
−36
Loading
Donate to e Foundation | Murena handsets with /e/OS | Own a part of Murena! Learn more
nr_busy_cpus in the sched_group_power indicates whether the group is semi idle or not. This helps remove the is_semi_idle_group() and simplify the find_new_ilb() in the context of finding an optimal cpu that can do idle load balancing. Signed-off-by:Suresh Siddha <suresh.b.siddha@intel.com> Signed-off-by:
Peter Zijlstra <a.p.zijlstra@chello.nl> Cc: Thomas Gleixner <tglx@linutronix.de> Link: http://lkml.kernel.org/r/20111202010832.656983582@sbsiddha-desk.sc.intel.com Signed-off-by:
Ingo Molnar <mingo@elte.hu>