+13
−3
Loading
Donate to e Foundation | Murena handsets with /e/OS | Own a part of Murena! Learn more
Start link negotiation in the open method. Previously it was started on driver initialialization and shutdown on close so an ifdown would have results in closing negotiation for good. Signed-off-by:Ralf Baechle <ralf@linux-mips.org> Signed-off-by:
Jeff Garzik <jeff@garzik.org>